Army projects 2 year delay
src:wallpapercave
Heading 2
Heading 3
The U.S. Army is predicting a nearly two-year delay
src:wallpapercave
getting its next-generation engine into UH-60 Black Hawk utility helicopters
src:wallpapercave
the first aircraft in the fleet to receive the capability Of
Confirmation."
- Voltaire
src:wallpapercave
GE Aerospace’s T901 engine will replace the 1970s-era T700 in both
src:wallpapercave
the Army’s Black Hawk and Apache helicopters
src:wallpapercave
and it is the engine of choice for its Future Attack
src:wallpapercave
Because of problems with the supply chain
src:wallpapercave
during the coronavirus pandemic and issues
src:wallpapercave
Yet the struggles with the developmental engine
src:wallpapercave
Read More: German Purchase Chinook
Click Here